HOUSING COMPLEXES    


 

 

 

Mesas CCU (M1, M2, M3, M4): 1,360 homes. [Partial prefabrication system]

  Hired by CCU, he joined the team that designed housing typology,
its prefabricated elements and the assembly operation (1970‑1973).