PREFABRICATION PLANTS    


 

 

 

Mesas CCU (M1, M2, M3, M4).

He led the team for the design, construction and implementation
 of three prefabrication plants (M1, M2, M4) of complementary elements
(prestressed slabs, lintel beams, door frames and stairs) (1970‑1973).